Current Status of Biodiesel Project

Alternative Energy Development Board (AEDB)’s project to electrify villages using Bio-Diesel on the basis of self generation is underway in Goth Umar Din Arain, in Tehsil Ghora Bari, Sindh. In this pilot project a Bio-Diesel production plant has been installed in the village for the purpose of village electrification.

The villagers are growing their own seeds for production of 70 liters of BioDiesel per batch that will be used for operating 15 KVA diesel generator. The energy produced form the generators will be used to electrify village.

Fig: Umar Din Arain Goth (Thatta)
The project equipment has been designed and fabricated as shown in Fig.

Locally Fabricated Biodiesel Plant (Patented)

 

 

 

All Rights Reserved © 2007 AEDB Pakistan Privacy Policy | Terms of Use
NEWS & EVENTS
ECC approves policy recommendation for use of biodiesel as an alternative fuel

PRESS RELEASE (LOIs)

First Wind Power project of Pakistan to come online soon.

AEDB and KPT sign an MOU for wind power project

Tawarqi Steel Mill goes Green

Energy Purchase Agreement and Implementation Agreement for Wind Power projects finalized.

PAKISTAN FIRST EVER MEGA WIND TURBINE ERECTED

Formation of Advisory Committee for the National Biodiesel Programme

First PPA signed of Waste/Biomass to Energy

2nd PPA signed of Biomass/Waste to Energy

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Powered by
AI SOFT

www.aisoft.com.pk