Alternative Energy Technologies >> Microwind >> Current Status


 

 

Current Status of Microwind Project

This project is designed to utilize wind energy for the provision of electricity to villages with suitable wind speeds. During this project 700 remote homes were provided electricity through 100 micro wind turbines each capacity of 500 Watts installed in Sindh and Balochistan as shown in Table 1 & 2. Other 39 wind turbines of same capacity are installed at different universities of Balochistan for research & development purposes as shown in table 3.

 

Table 1: Villages Electrified through Micro Wind Turbines at Sindh

S.No. Name of Goth Homes Electrified Turbines Installed
1 Gul Muhammad Khaskheli - Mirpur Sakro 12 03
2 Jumo Khan Khaskheli - Mirpur Sakro 60 12
3 Ismail Khaskheli 1 - Mirpur Sakro 5 01
4 Ismail Maphar - Mirpur Sakro 8 02
5 Mohd Hasan Khaskheli - Mirpur Sakro 14 03
6 Allah Dino Maphar - Mirpur Sakro 14 03
7 Hot Khan - Gharo 10 02
8 Sher Muhammad Hamaiti - Gujjo 48 10
9 Daandaari - Ghorabar 250 40
10 Lukman - Ghorabari 20 04
11 Sammo - Ghorabari 19 04
12 Ali Hasan Paareri - Ghorabari 120 01 (10 KW)
  Total 580 85

 

Table 2: Villages Electrified through Micro Wind Turbines at Balochistan

S.No. Name of Goth Homes Electrified Turbines Installed
1 Meer Isa - Kund Mali 03 01
2 Ramzan - Kund Malir 15 02
3 Haji Sher Muhammad - Kund Malir 35 05
4 Yaaqoob - Kund Malir 18 02
5 Mir Abdullah - Kund Malir 08 01
6 Haji Washi / Daghari - Kund Malir 32 04
  Total 111 15

 

Installation of Micro Wind Turbines at different Balochistan Universities for R & D

S.No. Site Location Turbines Installed
1 BUITM University, Quetta Takatu Campus 11
2 University of Engineering and Technology, Khuzdar 09
3 Lasbella University of Agricultural & Marine Sciences, Uthal 20
  Total 40

 

Each micro wind turbine capacity of 300 to 500 watt is used to provide electricity to masses living off-grid and at remote locations all over the country where suitable wind is blowing. It also caters to the need of 3 to 5 houses depending upon the number of rooms required to be lit up. Each household has been provided at least 2 energy saver lights and one power outlet for connection of another low-power appliance such as fan, small TV etc. 500 watts micro wind turbines are installed at Goth Jumma-Sindh and Kund Malir Balochistan. A 10 kw wind turbine is installed in village Ali Hassan Paareri, Ghorabari -Sindh that provides electricity to 120 homes.

500 Watts Micro Wind Turbines at Dandaari, Sindh

 

 

All Rights Reserved © 2007 AEDB Pakistan Privacy Policy | Terms of Use
NEWS & EVENTS
ECC approves policy recommendation for use of biodiesel as an alternative fuel

PRESS RELEASE (LOIs)

First Wind Power project of Pakistan to come online soon.

AEDB and KPT sign an MOU for wind power project

Tawarqi Steel Mill goes Green

Energy Purchase Agreement and Implementation Agreement for Wind Power projects finalized.

PAKISTAN FIRST EVER MEGA WIND TURBINE ERECTED

Formation of Advisory Committee for the National Biodiesel Programme

First PPA signed of Waste/Biomass to Energy

2nd PPA signed of Biomass/Waste to Energy

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 